Willow Ridge Phase 6
Owner:
Engineer:
Work Done:
Cost:
Willow Ridge Estates
T. Fenton Consulting
Earthworks, Piping, Concrete, Asphalt, Roadwork
$6.7 million
Wagon Wheel Business Park Lift Stations
Engineer:
Work Done:
Cost:
Sim-Flo Systems
Bulk Excavation, Piping, Roadworks
$1 million
Royalite Way Sanitary Replacement
Owner:
Engineer:
Work Done:
Cost:
Town of Turner Valley
MPE Engineering
Piping, Roadworks
$400 000
Okotoks Well #10
Owner:
Engineer:
Work Done:
Cost:
EPCOR / Town of Okotoks
Stantec
Piping
$400 000
Bassano Capital Works
Owner:
Engineer:
Work Done:
Cost:
Town of Bassano
BSEI Engineering
Piping
$400 000
Bailey Hill Sanitary Replacement
Owner:
Engineer:
Work Done:
Cost:
Town of Turner Valley
BSEI Engineering
Piping
$375 000
Rosemary Water Treatment Plant Upgrade
Owner:
Work Done:
Cost:
Village of Rosemary
Bulk Excavation, Piping
$150 000
Robert Street Sanitary Main Replacement
Owner:
Engineer:
Work Done:
Cost:
Town of Turner Valley
MPE Engineering
Piping
$100 000
Other Project Years
2008
2007
2006
2005
2004
2003
2002
2001
The workmanship was beyond reproach and the service
was exceptional, considering these busy times.
Cyrille Chabit
Project Manager
Lockerbie @ Hole Contracting Limited