Airdrie West Wastewater Lift Station
Owner:
Engineer:
Work Done:
Cost:
City of Airdrie
BSEI Engineering
Earthworks, Piping
$700 000
Black Diamond Water Main Replacement and Roadwork
Program
Owner:
Engineer:
Work Done:
Cost:
Town of Black Diamond
BSEI Engineering
Piping, Roadworks, Concrete & Asphalt
$800 000
Turner Valley Sewer Main Replacement / Historic
Gas Plant
Owner:
Engineer:
Work Done:
Cost:
Alberta Infastructure / Town of Turner Valley
MPE Engineering
Piping
$250 000